Nest Group | One Partner. One Subscription. Complete Energy Infrastructure.
Nest's Microgrid Solution · UK

Nest Microgrid Solution

Your site. Your energy. Our infrastructure. We fund, build and operate a complete private microgrid, solar, battery, EV charging and intelligent control, all under one fixed subscription. Lower bills, energy independence, zero upfront cost.

Nest Group Microgrid Energy Hub
The Nest Microgrid Solution

Now vs With a Nest Microgrid

Today your site draws everything from the grid. With the Nest Microgrid Solution, solar and battery carry the load, the grid becomes backup only.

Now fully grid-dependent vs With a Nest Microgrid, self-powered
Our Partners
Octopus Energy
Green Energy Switch
Cambridgeshire & Peterborough Combined Authority
Octopus Energy
Green Energy Switch
Cambridgeshire & Peterborough Combined Authority
Our Clients

Trusted Across the UK

Northampton General Hospital NHS Trust
Official Ferrari Dealer Dick Lovett Swindon
Pentre Awel Llanelli
Northampton General Hospital NHS Trust
Official Ferrari Dealer Dick Lovett Swindon
Pentre Awel Llanelli

See What the Nest Microgrid Solution Could Do for Your Site

Free site assessment. Free financial model. No obligation at any stage. A specialist responds within one business day.

Home/Nest's Microgrid Solution

Energy Independence,
Without the Complexity

Our MaaS model delivers a complete, self-managed energy system for your site, fully funded, installed, and operated by Nest Group. You pay only for the energy you consume, at a rate below your current tariff.

The Hidden Cost

Before You Use a Single Unit of Electricity

Most energy conversations focus on the unit rate. Far fewer businesses have properly examined what sits underneath, the fixed charges that land every single day regardless of consumption.

Daily Standing Charge
£149+
Per MW, charged every day whether you consume energy or not. On a 1MW connection that's over £54,000 a year before you've bought a single unit.
Connection Wait
2–5 yrs
Typical queue for new or upgraded high-capacity grid connections. Existing businesses with established connections represent the greatest opportunity, they're already carrying the cost.
The opportunity for existing businesses

If your business already has a grid connection, you are already paying tens of thousands of pounds a year in standing charges, capacity levies and pass-through costs, before you consume anything. These charges do not fall when energy prices fall. They rise with inflation. The Nest Microgrid Solution begins reducing that exposure from day one.

Our Story

We Built This for
Ourselves First

Nest Group started by solving our own energy problem. Facing the same rising bills, volatile tariffs and grid dependency that every UK business deals with, we designed and built a microgrid at our own Peterborough site, solar, battery storage, EV charging and intelligent management, all working as one system.

It worked. Our costs dropped, our carbon footprint fell, and we had something we hadn't had before, control over our own energy. That's when we realised we could do the same for other organisations.

We fund it, we build it, we run it. You get the benefit, a lower bill, a more resilient site, and no capital outlay. That's the Nest Microgrid Solution.

Delivered through
UK EV Charger — Nest Group Company
CPO Energy — Nest Group Company
Our site first
We proved the model at Maskew Avenue, Peterborough before offering it to anyone else.
Zero risk to you
We carry all capital, construction and performance risk for the full term. No surprises.
One point of contact
Design, funding, installation, monitoring and maintenance, all Nest Group, for the full term.
Before & After

Now vs With a Nest Microgrid

Today your site draws everything from the grid. With a Nest microgrid solution the grid becomes backup only.

Before and after comparison, fully grid dependent now vs self-powered with a Nest microgrid
Worked Example

Now vs With a Nest Microgrid

A real worked example from a Cambridgeshire manufacturing site, illustrating exactly what changes when a Nest Group microgrid replaces full grid dependence.

Now fully grid-dependent vs With a Nest Microgrid, self-powered
Current Cost, What You Pay Now
£121,532
Last 12 months, actual (ex VAT)
Baseline 21.0p / kWh
If You Don't Change, Next 12 Months
£155,302
Same usage at today's fees (ex VAT)
You pay +£33,770 more
Microgrid, Annual Cost
£108,288
Fully funded by Nest Group, zero upfront capex
You save £47,000 / yr, fully funded, zero capex
Microgrid, If Client-Funded
~£260,000
Indicative capex · ~7-yr simple payback
15-yr saving £705,000  ·  30-yr ~£2.83M

Figures are an indicative worked example. Microgrid cost, capex, payback and term are illustrative pending a site-specific Nest Group offer.

Proof It Works

Built. Deployed. Running.

We are not proposing a model. We have deployed integrated energy infrastructure, we have the operational data to prove it works, and we are actively expanding across the UK right now.

Zero Grid Draw
May 2026

An entire calendar month. Our operational head office site generated, stored and managed its own energy completely independently of the grid. No grid draw. No standing charge exposure. No red-period risk.

Grid Failure. We Never Stopped.
100% Uptime

When a grid failure left surrounding properties without power, our site remained completely operational throughout, running entirely on its own generation and battery storage. For NHS facilities, food production and data-sensitive operations, this resilience alone justifies the investment.

Net Carbon Negative
Our Site

This solution generated more clean energy than it consumed. Not an estimate, not a projection, actual operational data from a live site. The model working exactly as designed.

The question is not whether to act, it's how soon.
Long-Term Case

Carbon and Financial, Both Compound Over Time

A Nest microgrid pays back on two fronts. The carbon case supports your net-zero goals; the financial case strengthens every year as grid fees climb.

🍃
Carbon Benefits
Net Carbon
Negative
This solution generated more clean energy than it consumed
  • +10% more clean energy generated than used
  • Near-zero electricity carbon footprint
  • Supports net-zero & ESG reporting
  • ≈ 5,700 trees or 26 cars off the road
£
Financial Benefits
£705,000
saved over 15 years, fully funded, zero capex
  • ~£47,000 saved every year vs grid (fully funded, zero capex)
  • Protection from rising, volatile fees
  • Saving grows as grid tariffs climb
  • ROI strengthens with every increase
The question is not whether to act, but how soon.
Two Models

We Present Both Options, Honestly

Every site and every organisation is different. We offer two deployment models and will always recommend the one that serves your long-term interests.

Model One
Revenue Share
Zero capex · Zero operational responsibility

We deploy, fund, own and operate the full infrastructure. You receive a share of the energy revenue generated from day one, from infrastructure you did not have to pay for or manage.

No upfront capital required
No operational burden on your team
Revenue share from day one
Full infrastructure maintained by Nest Group
Model Two
Owned Infrastructure
Better long-term economics · Full revenue retention

You fund or part-fund the deployment and retain the full revenue stream. The economics are materially more favourable over a five to ten year horizon. We provide full technical support, energy management and grid trading capability under a long-term operational agreement.

100% of revenue stays with you
Significantly better long-term return
Full Nest Group operational support retained
Infrastructure asset on your balance sheet

We are transparent about this. The owned model delivers significantly better long-term economics. We will always present both options clearly and recommend the one that serves your organisation's long-term interests, not ours.

The Process

How Nest's Microgrid Solution Works

From first conversation to live microgrid, a structured, fully managed process with no capital outlay required from you at any stage.

01
🔍

Site Feasibility & Energy Audit

We analyse your energy consumption, peak demand, grid connection, and physical site to determine optimal microgrid configuration. Our engineers produce a detailed technical feasibility report and financial model, at no cost to you.

02
📐

System Design & Financial Modelling

Full engineering design covering solar, BESS, wind (where applicable), grid interface, and EMS specification, alongside a 25-year financial model showing projected savings, carbon reductions, and revenue potential specific to your site.

03
🏗️

Subscription Agreement & Funding

Nest Group funds the entire project. You enter a subscription paying for energy consumed at a pre-agreed rate below your current tariff. We carry all capital, construction, and long-term performance risk.

04

Construction & Commissioning

Our accredited installation teams build the complete system: grid connection, protection relays, BESS, EMS, and monitoring infrastructure. Typical build time is 10–20 weeks depending on scale and grid complexity.

05
📊

24/7 Operation, Monitoring & Optimisation

Our Network Operations Centre monitors continuously. Predictive maintenance and real-time remote optimisation maximise self-consumption, battery dispatch efficiency, and grid export revenue throughout the contract term.

Commercial Applications

Ideal for These Sectors

🏭 Industrial & Manufacturing

High-consumption sites with large roof or ground areas benefit most. Typical 35–45% energy cost reduction with the strongest investment economics in our portfolio.

🏢 Commercial Real Estate

Multi-tenanted parks offering below-market energy as a tenancy amenity, improving occupancy rates and ESG credentials simultaneously.

🏛️ Public Sector & Councils

Councils and NHS trusts reduce costs across estates while meeting statutory net zero commitments, without requiring capital borrowing or budget allocation.

🚛 Logistics & Distribution

Large flat-roof warehouses with 24/7 energy demand consistently deliver the strongest financial performance in our portfolio of projects.

⚓ Ports & Marine

Complex, high-demand port operations requiring robust resilience and shore-to-ship power, designed around operational continuity from day one.

🏗️ Property Developers

Embed a Nest Group microgrid into new commercial developments at design stage, creating a differentiated, future-ready asset from the outset.

Is Your Site Suitable for a Microgrid?

Our engineers will assess your site and deliver a detailed feasibility report within five working days, free of charge.

Home/EV Charging Infrastructure

Turn Your Car Park Into
a Revenue Asset

Nest Group funds, installs, and operates commercial EV charging infrastructure at your site through UK EV Charger, a Nest Group Company. You earn revenue from day one with zero upfront investment.

Revenue Opportunity

Earn From Your Existing Parking

The UK's EV transition is accelerating structurally. Smart property owners are locking in long-term charging income now, before the competition catches up.

🏪

Retail & Leisure Sites

High dwell time translates directly to high charging revenue. Attract EV-driving customers and earn per kWh dispensed.

£8k–£40k/bay/yr
🏢

Office & Business Parks

Workplace charging consistently achieves the highest utilisation rates, predictable daytime demand and strong employee satisfaction benefits.

£6k–£25k/bay/yr
🏨

Hotels & Hospitality

EV charging availability is an increasingly significant booking driver. Guests prioritise it when selecting accommodation and destinations.

£5k–£18k/bay/yr
🚉

Transport & Commuter Hubs

Park-and-charge near rail or bus links generates the strongest revenue performance of any EV charging use case in our portfolio.

£12k–£60k/bay/yr
🔌
Our Solutions

Public & Private Charging for Every Site

Public Access Charging Hubs, Rapid and ultra-rapid chargers (50kW–350kW) with contactless payment, network connectivity, and 24/7 remote monitoring. Designed for car parks, forecourts, and transport hubs.

Workplace & Destination Charging, 7kW–22kW AC chargers with RFID or app access, fleet management integration, and payroll deduction billing. For offices, business parks, and logistics operators.

Grid-Balanced EV Hubs, Smart charging integrated with solar and BESS, dynamically balancing local generation with EV load to substantially reduce grid import costs at peak periods.

Site Suitability

What Makes a Strong EV Charging Site

📍 Location & Footfall

Consistent daily visitor traffic, high dwell times, or regular commuter patterns generate the strongest return on our infrastructure investment.

⚡ Grid Capacity

We assess available DNO network capacity and can fund grid reinforcement works where necessary to enable large-scale charging deployments.

🅿️ Car Park Configuration

We work with surface car parks, multi-storeys, and underground facilities. A minimum of 10 spaces is typically required for our zero-capital model.

📋 Planning & Consents

Our team handles all planning applications, building control, and DNO connection consents, removing every administrative burden from your organisation.

How Much Could Your Car Park Earn?

Our EV team will model the revenue potential for your specific site within 48 hours, completely free.

Home/Solar PV & Battery Storage

Generate, Store, and
Control Your Energy

Commercial solar PV paired with intelligent BESS, delivering real savings, verified carbon reduction, and operational resilience for UK businesses and public sector organisations.

Solar PV

Rooftop, Carport & Ground-Mounted

We design and install commercial solar PV from 50kWp to 10MWp across all mounting configurations. Using tier-1 panels and high-efficiency inverters, our systems typically deliver a positive financial return from the first month of operation.

Integrated with the Nest EMS, the system learns your consumption patterns and dynamically maximises self-use, ensuring you consume as much of your own electricity as possible throughout every operating day.

  • Accredited installation, fully warranted
  • 25-year performance guarantees on all panels
  • Real-time generation monitoring included
  • Compatible with all smart export tariffs
☀️
🔋
Battery Storage

Intelligent BESS, The Commercial Standard

Our BESS systems are purpose-designed for commercial and industrial applications. Capacities from 100kWh to 10MWh using lithium iron phosphate chemistry for safety, longevity, and optimal cycle performance over a 20-year operational life.

The Nest EMS optimises charge and discharge in real time, storing cheap or self-generated electricity and dispatching it during peak tariff periods, cutting demand charges and energy costs substantially across your portfolio.

  • Peak shaving, reduce demand charges up to 60%
  • Time-of-use arbitrage, buy cheap, use expensive
  • Grid services revenue from FFR and DC markets
  • Back-up power for critical operational loads
Outcomes

What Solar + Storage Clients Achieve

20–45%

Bill Reduction

Typical electricity cost savings across our commercial solar + BESS portfolio in year one of operation.

60%

Demand Charge Cut

Battery peak shaving reducing demand charges that were previously unavoidable and paid in full every month.

100%

Carbon Verified

Independent verification for ESOS, SECR, and ESG reporting built into every project as standard.

25yr

Warranty

Tier-1 panels with manufacturer-backed 25-year performance warranties on every installation we deliver.

What Could Solar & Storage Save Your Organisation?

We'll model your savings potential in detail, free of charge, no obligation to proceed.

Home/Case Studies

Real Projects.
Real Results.

From veterinary practices to NHS hospitals, retail hubs to forklift fleets, every Nest Group project delivers measurable energy savings, revenue generation, and verified carbon reduction.

📦
ENERGY AUDIT
Energy Cost Analysis · Cambridgeshire · Food Packaging Manufacturer

68% Bill Increase, And How We'd Fix It

A Cambridgeshire food packaging manufacturer saw their all-in electricity cost jump from 24.0p to 40.4p per kWh in nine months, a 68% rise on a like-for-like basis. The biggest driver wasn't the commodity rate (+45%). It was fixed capacity and standing charges rising 153% and spreading over fewer units as consumption halved. Peak demand was just 111 kVA against a contracted 500 kVA, meaning they were paying for four times the capacity they needed. Nest Group identified £40,000+ of recoverable annual savings across six stacked interventions, starting with two low-effort quick wins.

Solar PV + Battery
~£23,400/yr
Behind-the-meter self-consumption
Capacity Right-sizing
~£7,728/yr
500 → 150 kVA · low effort
EII Exemption
~£7,339/yr
Relief on RO / FiT / CfD levies
CCL + Power Factor + Shifting
~£2,116/yr
Three stacking quick wins
+68%
Bill Rise (9 months)
40.4p
vs 24.0p per kWh
£40k+
Recoverable/yr
2 wins
Zero CapEx to Start
🏢
LIVE
Solar PV · Battery Storage · EV Charging · Intelligent EMS · Peterborough

Nest Group Head Office, Bourges View

The site where the Nest Microgrid Solution was first deployed, on our own premises, before we offered it to anyone else. Solar generation, battery storage, EV charging and intelligent energy management operating as a fully integrated system. In May 2026 the site recorded zero grid draw for an entire calendar month. When a grid failure left surrounding properties without power, our site never stopped. Ultra-rapid EV charging delivered to subscribers at 19p/kWh, against an industry average of 79–84p, powered entirely by on-site generation.

Zero
Grid Draw, May 2026
100%
Uptime During Grid Failure
19p/kWh
EV Charging (vs 79–84p avg)
Net Carbon
Negative
Operational Data
🏥
NHS HOSPITAL
EV Charging · Back-Office Management · Northampton

Northampton General Hospital

70 AC charge points installed across the hospital site, complete with full back-office management system for staff, patient, and visitor use. Future expansion is already planned, including ultra-rapid DC charging and solar PV integration to further reduce grid reliance and support the hospital's sustainability targets. A flagship public sector deployment.

70
AC Charge Points
NHS
Public Sector
Back-Office
Management
DC + Solar
Expansion Planned
🛒
RETAIL HUB
Ultra-Rapid DC EV Charging · Load Management · Peterborough

Hampton Hub, Peterborough Retail Park

Ultra-rapid DC EV charging up to 150kW deployed at Hampton Hub, a prime Peterborough retail destination with shops, food, and amenities. The installation includes smart load management, built-in future expansion capacity, and sustainability-focused energy solutions, generating passive revenue for the site while serving the growing EV driver population in the area.

150kW
Ultra-Rapid DC
Retail
Prime Location
Load Mgmt
Smart System
Expandable
Future Ready
🏊
LEISURE CENTRE
EV Charging · AC & DC · 24/7 Managed · Llanelli, Wales

Pentre Awel, Canolfan Llanelli, Carmarthenshire

Smart, 24/7 managed AC and DC EV charging bays at Canolfan Pentre Awel, Llanelli, a major leisure and wellbeing destination in Carmarthenshire. The installation serves fleets, staff, and visitors with fast, flexible charging while directly contributing to the centre's sustainability strategy and reducing its dependency on grid-only power.

AC + DC
Dual Charging
24/7
Managed
Fleet + Public
Multi-Use
Wales
Location

Want to Be Our Next Case Study?

Every project starts with a free consultation. Tell us about your site and we'll show you what's possible.

Home/About Nest Group

Built by Engineers.
Driven by Outcomes.

Nest Group was founded to make commercial-scale clean energy infrastructure accessible, practical, and financially compelling for every organisation, regardless of budget or technical expertise.

Our Mission

Accelerating the UK's Energy Transition

We believe the transition to clean, resilient, and affordable energy is not just a necessity, it is an enormous commercial opportunity for organisations that act early and act decisively. Nest Group exists to help commercial and public sector clients capture that opportunity.

Our managing partners have worked within the energy sector for over four decades combined, from LED lighting to EV charging infrastructure, solar power to battery storage, and now to complete microgrid delivery. That depth of direct experience means we understand both the technology and the commercial reality our clients face every day.

We are not a broker or an intermediary. We are a developer, funder, and operator. That means we are directly accountable for the performance of every asset we deliver, for the full life of the project.

🏢
Our Values

How We Show Up, Every Day

🎯

Outcomes First

We are judged by results, not effort. Every recommendation is grounded in data, not aspiration or commercial convenience.

🤝

Long-Term Thinking

We build relationships and infrastructure designed to last decades. Short-term decisions are never made at the expense of long-term value.

🔬

Technical Excellence

Our engineering team continually pushes the boundaries of what commercial energy infrastructure can deliver at every scale we operate.

🌍

Environmental Integrity

Everything we do reduces carbon. We never greenwash, our reporting is independently verified and fully transparent at all times.

💡

Honest Advice

If a project doesn't stack up commercially, we say so clearly. Our reputation is built on candour, not salesmanship.

Delivery Approach

End-to-End. One Accountable Partner.

Unlike brokers and aggregators, Nest Group owns every stage of the delivery process, from feasibility through to long-term operation.

Feasibility & Design

In-house engineering producing detailed technical and commercial feasibility reports, system designs, and financial models, at our cost before any commitment is made by you.

Planning & Consents

In-house planning team managing all applications, environmental assessments, grid connection agreements, and regulatory consents from start to finish.

Construction

Accredited installation teams delivering turnkey projects to programme, with robust supply chain controls and quality assurance throughout.

Operation & Optimisation

NOC providing 24/7 system monitoring, predictive maintenance, real-time optimisation, and monthly performance reporting for every live asset in our portfolio.

Accreditations

Standards We Hold Ourselves To

Let's Build Something Significant Together

Whether you're at the early thinking stage or ready to move immediately, our team wants to hear from you.

Home/Get Your Solution Proposal

Get Your
Solution Proposal

Tell us about your site and what you want to achieve. We'll come back with a tailored proposal, zero obligation, zero cost.

No obligation. No pushy sales calls. A specialist responds within one business day.

What You'll Receive
Free Site Assessment
Full technical and financial review of your site
Tailored Financial Model
Your specific savings, payback and 25-year projection
System Design Proposal
Indicative system sizing and component specification
Zero Cost, Zero Obligation
No charge, no commitment required at any stage
Contact Us Directly
📞
0333 2026 790
Mon–Fri, 8am–6pm
📍
14 Bourges View, Maskew Avenue
Peterborough, PE1 2FG
What Happens Next
1
Specialist reviews your enquiry and responds within one business day
2
Free site assessment and energy audit scheduled at your convenience
3
Tailored proposal with full financial model delivered, no obligation
Nest Group
Online, typically replies instantly

Hi there 👋
How can we help?

We build, fund, and operate solar, battery storage, and EV charging across the UK. Pick a path to get started.